The Chiahui phase 2 combined cycle power plant is located in Taiwan next to the Minxiong city (on the West side of the island).
Needs
- Tight and challenging project time schedule.
- For the phase 2, the ACC has been erected with a very limited available working area due to existing installations and existing roads from the phase 1.
- Environmental and site’s constraints (Hazardeous area, high seismicity and windy area, very low acoustic requirements).
Solution
- Construction with a high modularity.
- High efficiency thermal design with a low subcooling, a low ACC back pressure, and a low electrical fan power consumption.
- Very low noise equipment & design.

Execution
- Fast track delivered and erected project despite of the Covid pandemia.
- Local sourcing & subvendors audits / qualifications with our experienced team.
- Coordination of SPG subvendors and EPC’s sub-contractors.
Benefits
- Construction with a high modularity.
- High efficiency thermal design with a low subcooling, a low ACC back pressure, and a low electrical fan power consumption.
- Very low noise equipment & design.