Lisahally power plant, situated about 117km North West of the city of Belfast, North of Ireland, a 15,8 MWe biomass power plant.

SPG ModuleAir™  Air Cooled Condenser designed and manufactured for Lisahally (Evermore) biomass renewable power plant located in Londonderry port and harbour,  Ireland.

The power plant will generate 15,8 MWe of electrical power, the equivalent of enough to power 25.000 homes and business in the area.

Needs

  • Achieve a low turbine back pressure for optimum turbine output.
  • Focus on the tight supply material schedule by intense and close engineering and Project collaboration in order to achieve the plan.
  • Focus on Factory Assembled of Major Items of ModuleAir™ (Tube Bundles, Steel Structure) sized for an optimization container transport and a fast erection sequence.

Solution

ModuleAir™ is an innovative approach to steam condensing that optimizes Air Cooled Condenser, design and performance characteristics.

Execution

  • High quality and high performance equipments delivered according to the project’s extremely demanding tight delivery schedule.
  • Fast erection completion and early start of power plant commercial operation

Benefits

  • High performance, low back pressure, improved performance during low ambient conditions.
  • Construction saving of up to 25% when compared to classic A-frame design.
  • Reduced steam duct site welding – site welding of bundle/tube sheet not required.
  • Reduced structural steel and duct weight
  • Fewer heat exchanger bundles
  • Reduced visual impact – lower height – smaller foot print.
  • Fewer number of fin tube bundles.
  • 50 % reduction of steel parts assembled on site.
  • Improved delivery logistics.
  • Shorter construction time.
  • Fewer lifting operations.
  • Efficient, safer construction.

Contact us for more info

Share this reference

Related references

Reference: Guernsey Power Plant W-Style®

See here some impressive pictures of Guernsey Power Station located in the USA. This ACC has the W-Style ACC® design, perfect for larger power plants.

Reference: Bazian

We are delighted to announce the Bazian 750MW Combined Cycle Project in Sulaymaniyah, Iraq, was successfully completed and connected to the national power grid. SPG Dry Cooling delivered an A-Frame of 42 cells.

Case study: Riyadh PP11

The Riyadh PP11 IPP Power Plant, situated about 150 km West of the city of Riyadh, Saudi Arabia, 2×850 MW Combined Cycle Power Plant.