Case study: Qinling

SPG Dry Cooling IDCT Air Cooled Condenser designed and manufactured for QINLING project.

Needs

  • First IDCT project in China market.
  • MR New product with steel tube& fin.

Solution

  • Vertical double layer arrangement.
  • First Chimney, FGD, natural draft tower in one tower project.

Benefits

  • Worked closely with Belgium Research Centre.
  • Well communicated with the customer and fully understood the customer`s requirements.
  • High frozen resistance.
  • High heat exchange efficiency.

Contact us for more info

Share this reference

Related references

Reference: Guernsey Power Plant W-Style®

See here some impressive pictures of Guernsey Power Station located in the USA. This ACC has the W-Style ACC® design, perfect for larger power plants.

Reference: Bazian

We are delighted to announce the Bazian 750MW Combined Cycle Project in Sulaymaniyah, Iraq, was successfully completed and connected to the national power grid. SPG Dry Cooling delivered an A-Frame of 42 cells.

Case study: Riyadh PP11

The Riyadh PP11 IPP Power Plant, situated about 150 km West of the city of Riyadh, Saudi Arabia, 2×850 MW Combined Cycle Power Plant.