Case study: Chiahui
Case study
Chiahui
The Chiahui phase 2 combined cycle power plant is located in Taiwan next to the Minxiong city (on the West side of the island).
01
Needs
-
Tight and challenging project time schedule.
-
For the phase 2, the ACC has been erected with a very limited available working area due to existing installations and existing roads from the phase 1.
-
Environmental and site’s constraints (Hazardeous area, high seismicity and windy area, very low acoustic requirements).
02
Solution
-
Construction with a high modularity.
-
High efficiency thermal design with a low subcooling, a low ACC back pressure, and a low electrical fan power consumption.
-
Very low noise equipment & design.
03
Execution
-
Fast track delivered and erected project despite of the Covid pandemia.
-
Local sourcing & subvendors audits / qualifications with our experienced team.
-
Coordination of SPG subvendors and EPC’s sub-contractors.
04
Benefits
-
Construction with a high modularity.
-
High efficiency thermal design with a low subcooling, a low ACC back pressure, and a low electrical fan power consumption.
-
Very low noise equipment & design.
Overview
- Client Chiahui
- Country Taiwan
- Application Industry
- MegaWatt 500 MW
- Product W-Style® Air Cooled Condenser